What is the volume in cubic yards of material removed from a trench measuring 120 ft by 4 ft with a removal depth of 6 inches?

Prepare for the California Pipeline Contractor C-34 License Exam. Study with practice quizzes, flashcards, and multiple choice questions with explanations. Boost your confidence and get ready for your exam!

Multiple Choice

What is the volume in cubic yards of material removed from a trench measuring 120 ft by 4 ft with a removal depth of 6 inches?

Explanation:
Volume is found by multiplying length, width, and depth, then converting from cubic feet to cubic yards. The trench is 120 ft long and 4 ft wide, with depth 6 inches (0.5 ft). So the volume in cubic feet is 120 × 4 × 0.5 = 240 ft³. Since 1 cubic yard = 27 cubic feet, the volume in cubic yards is 240 ÷ 27 ≈ 8.888..., which rounds to 8.9 cubic yards.

Volume is found by multiplying length, width, and depth, then converting from cubic feet to cubic yards. The trench is 120 ft long and 4 ft wide, with depth 6 inches (0.5 ft). So the volume in cubic feet is 120 × 4 × 0.5 = 240 ft³. Since 1 cubic yard = 27 cubic feet, the volume in cubic yards is 240 ÷ 27 ≈ 8.888..., which rounds to 8.9 cubic yards.